[X] [X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X]High-voltage equipment for "Gazprom Neft-Khantos" - News
[X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X][X]

High-voltage equipment for "Gazprom Neft-Khantos"

similar news
3rd delivery transformers

for "LUKOIL-Western Siberia"

Transformers for oil refinery

"RN-Yuganskneftegas"

Transformers for oil refinery

JSC "Samaraneftegas"

Electrical equipment

for Purovsky plant

Installation of transformers

for Rosneft

2nd delivery transformers

for "LUKOIL-Western Siberia"

[X]

LLC "Gazprom Neft-Khantos" — is one of the largest subsidiaries of the company "Gazprom Neft" has started construction of electrical supply booster pump station № 7 South of the license area of the Priobskoye oil field and signed contracts with our company for the supply of 6 gas-insulated current transformers SG-UETM-110II*F1* 2 gas-insulated circuit breakers WEB-110II*-40/2500 NF1 for 110 kV substation booster pump station.

The equipment will make our long-standing partner of CJSC "UETM".

Booster pump station is required in remote oilfields for the transportation of oil-gas mixture prior to the IPW* and separation of oil from gas, cleaning gas from the liquid droplet and the subsequent separate transportation of hydrocarbons. The oil thus pumped by the centrifugal pump powered by a motor, the gas is pumped by the pressure of the separation.

With "Gazpromneft-Khantos" our company works not for the first time. Previously we have delivered 2 sets of power supply system of production of LLC "Oldham" for indoor switchgear 6 kV CinemaScope field and substation 35/6 kV booster pump station Priobskoye oil field.

* IPW (installation of preliminary water) — device for separating oil from produced water and associated gas, and heating oil and the increment of the specific energy of the flow of extracted oil (pressure) after the next system oil treatment.

[X]
[X]